MANHATTAN WORK
QUEENS WORK
5. Drilling a soldier pile that will support excavation east of the 39th Street Bridge in Harold Interlocking for a tunnel approach structure.
8. Spreading gravel in preparation to pour the base slab in the final approach structure in Harold Interlocking.
For more information and photos of work at East Side Access, please visit the East Side Access project page on AModernLI.com - https://www.longislandrailroad.site/project/east-side-access/.
